Boronia Manufacturing Plant Rooftop Extension
Barra Steel was recently contracted to shop draw, fabricate and erect a huge new plant platform on top of an existing building. We spent a considerable amount of time working in the existing roof space preparing the existing structure to take the huge load that was to set onto it and then over a weekend the structure was erected with a 220 tonne crane. A problem occurred when some of the columns, due to a survey error had to be rushed back to Barra’s premises and altered which took until 11pm on a Saturday evening, which is just one of the reasons why this particular client has such a great association with our company – because we always go the extra mile!